(1) The surface of the base iron must be treated to Sa2.5 level before painting. It is strictly prohibited to bring in water, dust, and oil during construction to ensure the quality of painting.
(2) The paint ratio is: Component A (base material), Component B (curing agent) = 9kg paint: 1kg curing agent (or construction according to the ratio informed by our factory).
(3) The construction proportioning method is: open the mouth of component A, add component B into component A, and stir thoroughly. After curing for 30 minutes, it can be painted.
(4) This material is required to be used as soon as it is mixed, and the mixed paint must be used up within six hours. Unfinished materials must be sealed and stored.
(5) Construction should be stopped on rainy days or when the relative humidity is greater than 75%. For areas with severe corrosive media, it is recommended to apply multiple coats of paint.
(6) The product should be stored in a cool and dry place, away from direct sunlight, isolated from fire sources, and away from heat sources.
(7) The storage period is twelve months. After the expiration of the period, various technical indicators should be inspected. If the requirements are met, it can continue to be used.